The gure below presents the start-up hardware scan order of the device as well as the I/O naming
principles.
Figure. 8.1. - 94. AQ-X215 hardware scanning and I/O naming principles.
1. Scan
The start-up system; detects and self-tests the CPU module, voltages, communication and the
I/O; nds and assigns "DI1", "DI2", "DI3", "OUT1", "OUT2", "OUT3", "OUT4" and "OUT5".
2. Scan
Scans Slot A and nds the four channels of the VT module ( xed for AQ-X215). If the VTM is
not found, the device issues an alarm.
3. Scan
Scans Slot B, which should always remain empty in AQ-X215 devices. If it is not empty, the
device issues an alarm.
4. Scan
Scans Slot C, and moves to the next slot if Slot C is empty. If the scan nds an 8DI module (that
is, a module with eight digital inputs), it reserves the designations "DI4", "DI5", "DI6", "DI7", "DI8",
"DI9", "DI10" and "DI11" to this slot. If the scan nds a DO5 module (that is, a module with ve
digital outputs), it reserves the designations "OUT6", "OUT7", "OUT8", "OUT9" and "OUT10" to
this slot. The I/O is then added if the type designation code (e.g. AQ-P215-PH0AAAA-BBC)
matches with the existing modules in the device. If the code and the modules do not match, the
device issues and alarm. An alarm is also issued if the device expects to nd a module here but
does not nd one.
5. Scan
Scans Slot D and nds the ve channels of the CT module ( xed for AQ-X215). If the CTM is
not found, the device issues an alarm.
AQ-E215
Instruction manual
Version: 2.01
167
© Arcteq Relays Ltd
Содержание AQ-E215
Страница 1: ...AQ E215 Energy management IED Instruction manual ...
Страница 4: ...206 11 Contact and reference information AQ E215 Instruction manual Version 2 01 3 Arcteq Relays Ltd ...
Страница 186: ...Figure 8 13 113 Device installation AQ E215 Instruction manual Version 2 01 185 Arcteq Relays Ltd ...
Страница 206: ... Pt100 1000 Balco500 Ni power module AQ E215 Instruction manual Version 2 01 205 Arcteq Relays Ltd ...