
3
Installing Intuvo 9000 GC Column
To Replace the 9000 GC/MS Tail
64
7000/7010 Series TQ GC/MS Operating Manual
13
Replace the gasket. (See
“To Replace an Intuvo 9000 GC Gasket”
page 57.)
14
Carefully slide the 9000 GC/MS Tail into the GC/MS interface, and gently
place the click and run connection into the bus connection.
15
Check that the 9000 GC/MS Tail click and run fitting sits flat against the
gasket in the bus connection.
16
Screw the 9000 GC/MS Tail column nut to the transfer line threaded
connector finger tight, then use a ¼-inch wrench to tighten the nut an
additional 20 to 30 degrees.
17
Loosely install the two compression bolts.
Figure 14.
MS tail heater assembly clamp open with 9000 GC/MS Tail removed
Figure 15.
9000 GC/MS Tail removed from GC/MS Interface
Ferrule release hole
Transfer line
Bus click and run
connection
Ferrule and nut
Click and run connection
Exit in ion
source
CAUTION
Use the Intuvo torque driver to tighten the compression bolt until you hear one
click. Over-tightening can damage the flow path, strip the fittings, and cause
leaks.
Содержание 7010 Series
Страница 1: ...Agilent 7000 7010 Series Triple Quadrupole Operating Manual ...
Страница 12: ...12 7000 7010 Series TQ GC MS Operating Manual To Install a CI Source Filament 240 ...
Страница 128: ...5 Operating in EI Mode To Save a Method on the 7890 GC 128 7000 7010 Series TQ GC MS Operating Manual ...
Страница 204: ...7 General Maintenance To Close the Rear Analyzer Chamber 204 7000 7010 Series TQ GC MS Operating Manual ...
Страница 241: ......
Страница 242: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G7003 90050 G7003 90050 ...