
8
CI Maintenance
To Connect or Disconnect 7000 Series CI Source Wiring
218
7000/7010 Series TQ GC/MS Operating Manual
To Connect or Disconnect 7000 Series
CI Source Wiring
This topic is used to identify the wiring connections to the ion source. (For
detailed procedures and videos, see
“To Remove the 7000 Series CI Source”
“To Install the 7000 Series CI Source”
Materials needed
•
Gloves, clean, lint-free (Large 8650-0030) (Small 8650-0029)
•
Pliers, long-nose (8710-1094)
•
Tweezers (8710-2460)
Procedure
1
Use tweezers or pliers to connect or disconnect the ceramic board wire leads
at the source connectors. (See
2
Use tweezers or pliers to connect or disconnect the source heater wire leads
at the CSB.
Figure 74.
Wiring between the CSB and the CI source
Ceramic source board
Entrance lens
Ion focus
Filament 1
Repeller
Dummy filament
Source heater
Source RTD
Содержание 7010 Series
Страница 1: ...Agilent 7000 7010 Series Triple Quadrupole Operating Manual ...
Страница 12: ...12 7000 7010 Series TQ GC MS Operating Manual To Install a CI Source Filament 240 ...
Страница 128: ...5 Operating in EI Mode To Save a Method on the 7890 GC 128 7000 7010 Series TQ GC MS Operating Manual ...
Страница 204: ...7 General Maintenance To Close the Rear Analyzer Chamber 204 7000 7010 Series TQ GC MS Operating Manual ...
Страница 241: ......
Страница 242: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G7003 90050 G7003 90050 ...