PROPRIETARY INFORMATION
CONFIDENTIAL MATERIAL
Not for Customer Distribution
Hardware
AEROSET
®
System Troubleshooting Guide
237
94816-107—November 2004
Reagent Carousel Alignment
NOTE:
This procedure is performed after
R1A Probe
Horizontal Adjustment
.
1. Install a clean, empty reagent cartridge in position A1 of
the Reagent Supply Center.
2. Select the
Maintenance Utilities
icon in the Action Area
of the Main Display. The
MAINTENANCE UTILITIES
screen displays.
3. Select the
Rgt Area 1
tab. The
Rgt Area 1
page displays.
4. Select
Rgt Arm A Horz Rgt <Adj>
.
5. Select
A-Line (Outer) A <Adj>.
Figure 19: MAINTENANCE UTILITIES Screen, Rgt Area 1
Page
NOTE:
Steps 1 through 5 position the empty
cartridge in the R1A adjustment position.
A-Line (Outer)
A <Adj>
Содержание AEROSET
Страница 19: ...AEROSET System Troubleshooting Guide 19 94816 107 November 2004 Assays Reagents Assays Reagents ...
Страница 221: ...AEROSET System Troubleshooting Guide 221 94816 107 November 2004 Section 10 Hardware Hardware ...
Страница 245: ...AEROSET System Troubleshooting Guide 245 94816 107 November 2004 Flowcharts Troubleshooting Flowcharts ...