ZP3 Fire Control Panel
Installation
ZP3 Fire Control Panel Manual
Page 4 - 4
UD1160.4 Iss 6 (25/02/2005)
I
4
4.4 Wiring
Wiring should be connected to terminals in a neat and orderly manner. All screens must be
connected, and terminals must be adequately tight and secure. The panel must be properly
earthed as shown. Different types of wiring must be segregated as indicated below, to
prevent cross-cable interference.
1
Data cabling separated from other cables
4
Earth
2
Z-loops & low voltage control cabling separated
from high voltage cables
5 RS485
port
3
Mains cabling separate from low voltage wiring
Summary of Contents for ZP3
Page 1: ...ZITON ZP3 Fire Control Panel Installation Operation Maintenance...
Page 2: ......
Page 10: ......
Page 12: ......
Page 29: ...ZP3 Fire Control Panel Installation Manual Section 2 ZP3 Panel UD1160 2 Issue 6 25 02 2005...
Page 30: ......
Page 63: ...ZP3 Fire Control Panel Installation Manual Section 3 Power Supply UD1160 3 Issue 6 25 02 2005...
Page 64: ......
Page 81: ...ZP3 Fire Control Panel Installation Manual Section 4 Installation UD1160 4 Issue 6 25 02 2005...
Page 82: ......
Page 91: ...ZP3 Fire Control Panel Installation Manual Section 5 Field Wiring UD1160 5 Issue 6 25 02 2005...
Page 92: ......
Page 106: ......
Page 108: ......
Page 128: ......
Page 130: ......
Page 144: ......
Page 150: ......
Page 158: ......
Page 159: ...ZP3 Fire Control Panel Installation Manual Operator Instructions UD1160 O Issue 6 25 02 2005...
Page 160: ......
Page 189: ...ZP3 Fire Control Panel Installation Manual Maintenance UD1160 M Issue 6 25 02 2005...
Page 190: ......
Page 214: ......
Page 216: ......
Page 220: ......