![background image](http://html1.mh-extra.com/html/zeiss/lattice-lightsheet-7/lattice-lightsheet-7_instructions-manual_3406249038.webp)
SAFETY INFORMATION
ZEISS
User Interface - Mounting and Dismounting Components
Lattice Lightsheet 7
38
000000-2324-960
04/2021 V_01
Hydraulic Connections
The gases from the bottle or laboratory gas line (for Air/O
2
also a compressor can be used) need to be
connected to the Gas Mixer with the OD 6 mm polyurethane tubing of the respective color. This tubing is
delivered with the system. To connect the gas tubing to the Gas Mixer, push the tubing into the push-in
fittings of the respective ports (Fig. 22).
Always connect all gas input ports with the appropriate gas (1 bar/14.5 psi). Do not leave any input
ports open.
Only disconnect the tubing when the gas line is depressurized. First, switch off the pressure from the
gas line. Control the remaining pressure on the gas line’s pressure reducing valve. Then remove the
tubing.
1 Power
Control LED for power channel
6 CAN Bus 2
Can bus connection to Lattice
Lightsheet 7 Gas Can Bus
2 N
2
Control LED for N
2
supply
7 On/Off
On/off switch
3
Air/O
2
Control LED for air/O
2
supply
8 Output 1
Connects to blue tubing with white
label of the heated tubing package
4
CO
2
Control LED for CO
2
supply
9 Output 2
Connects to blue tubing with yellow
label of the heated tubing package
5
Humidifier
Control LED for humidity
10 Input (1 bar) CO
2
Connects to CO
2
supply
11 Input (1 bar) Air
Connects to air supply
12 Input (1 bar) N
2
Connects to N
2
supply
13 Humidifier
Heating humidifying column
14 Humidifier Sensor
Humidity sensor
15 Power
External power supply
16 CAN Bus 1
Can bus connection to Temperature
controller
17 USB
For connecting to computer
Fig. 22
Gas mixer front panel (left) and rear panel (right)