SAFETY INFORMATION
ZEISS
User Interface - Mounting and Dismounting Components
Lattice Lightsheet 7
44
000000-2324-960
04/2021 V_01
12.
Connect the Humidifyer Sensor socket of the gas mixer to the Gas supply line socket of the Lattice
Lightsheet 7 (Fig. 25/
8a
).
13.
Connect the CAN bus of the Gas Mixer to the Temperature Controller (Fig. 25/
8c
) and the Lattice
Lightsheet 7 (Fig. 25/
8b
).
Fig. 25
Electric and gas circuits of the heating and gas incubation systems
1
Lattice Lightsheet 7
2
Heated chamber
2a
Gas connection tube
2b
Electrical connection cable
3
Humidifying column
4
Heated Tubing Package
4a
Tubing white plugged end to LLS 7
4b
Heating cable connecting gas mixer to humidity column
4c
Tubing yellow marked end (gas mixer)
4d
Tubing white end of gas mixer & blue end of humidifying column
5
Supply tubing
5a
CO
2
supply tubing
5b
Air supply tubing
5c
N
2
supply tubing
6
Air filter
6a
Filter for CO
2
supply tubing
6b
Filter for air supply tubing
6c
Filter for N
2
supply tubing