9.1 Inspection Schedule
9-2
Table. 6 Inspection Items
Items
*4
Schedule
Method
Operation
Inspection Charge
Daily
1000
H
Cycle
6000
H
Cycle
12000
H
Cycle
24000
H
36000
H
Specified
Person
Licensee
Service
Company
•
Tram mark
¡
Visual
Check tram mark
accordance and
damage at the home
position.
¡
¡
¡
‚
External lead
¡
Visual
Check for damage
and deterioration of
leads.
¡
¡
¡
ƒ
Working area
and
manipulator
¡
Visual
Clean the work area
if dust or spatter is
present. Check for
damage and outside
cracks.
¡
¡
¡
„
S,L,U-axes
motor
¡
Visual
Check for grease
leakage.
*5
¡
¡
¡
…
Baseplate
mounting
bolts
¡
Spanner
Wrench
Tighten loose bolts.
Replace if necessary.
¡
¡
¡
†
Cover mount-
ing screws
¡
Screw-
driver,
Wrench
Tighten loose bolts.
Replace if necessary.
¡
¡
¡
‡
Base connec-
tors
¡
Manual
Check for loose con-
nectors.
¡
¡
¡
ˆ
RBT-axes
timing belt
¡
Manual
Check for belt
tension and wear.
¡
¡
‰
Wire harness
in manipulator
(SLURBT-
axes leads))
¡
Visual
Multimeter
Check for conduc-
tion between the
main connecter of
base and intermedi-
ate connector with
manually shaking the
wire. Check for wear
of protective spring
*1
¡
¡
¡
Replace
*2
¡
Š
Wire harness
In manipulator
(BT-axes
leads)
¡
Visual
Multimeter
Check for conduc-
tion between termi-
nals and wear of
protective spring.
*1
¡
¡
¡
Replace
*2
¡
Battery unit in
manipulator
¡
Replace the battery
unit when the battery
alarm occurs or the
manipulator drove for
36000H.
¡
¡
1 1
Summary of Contents for Motoman UP6
Page 4: ...UP6 Manipulator Manual ii MOTOMAN NOTES...
Page 65: ...11 1 S Axis Parts List 11 1 11 Parts List 11 1 S Axis Parts List...
Page 67: ...11 2 L U Axis Driving Unit 11 3 11 2 L U Axis Driving Unit...
Page 69: ...11 3 R Axis Driving Unit 11 5 11 3 R Axis Driving Unit...
Page 71: ...11 4 Wrist Unit 11 7 11 4 Wrist Unit...
Page 73: ......
Page 82: ...viii...
Page 94: ...1 4 Equipment Configuration 1 12...
Page 108: ...3 8 Open Phase Check 3 8...
Page 131: ...20...
Page 146: ...xiv...
Page 147: ...Setup Diagnosis...
Page 148: ......
Page 150: ...1 2...
Page 158: ...2 1 Protection Through Security Mode Settings 2 8...
Page 256: ...3 17 File Initialize 3 98...
Page 278: ...4 2 Addition of Base and Station Axis 4 22...
Page 296: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Page 297: ...Hardware...
Page 298: ......
Page 308: ...6 4 Equipment Configuration 6 10...
Page 359: ...Maintenance...
Page 360: ......
Page 368: ...8 8 Open Phase Check 8 8...
Page 388: ...9 4 Recommended Spare Parts 9 20...
Page 389: ...Alarm Error...
Page 390: ......
Page 462: ...11 1 Error Message List 11 18...
Page 463: ......
Page 466: ......
Page 530: ......
Page 531: ......
Page 533: ......
Page 534: ......
Page 535: ......
Page 536: ......
Page 537: ......
Page 538: ......
Page 539: ......
Page 540: ......
Page 541: ......
Page 542: ......
Page 543: ......
Page 544: ......
Page 545: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......
Page 554: ......
Page 555: ......
Page 556: ......
Page 557: ......
Page 558: ......
Page 559: ......
Page 560: ......
Page 561: ......