7.5 General I/O Signal Assignment
7-24
7.5
General I/O Signal Assignment
7.5.1
Arc Weldin
JANCD-XIO02 (CN12 Connector) I/O Allocation and Connection Diagram
Each Point
24VDC
50mA max.
JANCD-XTU01
CN26
-9
-10
-7
-8
A20
B20
A19
B19
A18
B18
A17
B17
A16
B16
A15
B15
A14
B14
A13
B13
A12
B12
A11
B11
A10
B10
A9
B9
A8
B8
A7
B7
A6
B6
A5
B5
A4
B4
A3
B3
A2
B2
A1
B1
Each Point
24VDC
8mA max.
Name
Signal
YASNAC-XRC
JZNC-XIU01
CN12 Connector
B1
A1
B2
A2
B3
A3
B4
A4
B5
A5
B6
A6
B7
A7
B8
A8
B9
A9
B10
A10
B11
A11
B12
A12
B13
A13
B14
B15
A14
A15
B16
B17
A16
A17
B18
A18
B19
A19
B20
A20
Connector Terminal Converter
(Optional)
Model:PX7D-40V6-R
+24VU
+24 VE
0
24
VE
JANCD-XIO02
Terminal
Number
2010
2011
2012
2013
2014
2015
2016
2017
2020
2021
2022
2023
3010
3011
3012
3013
3014
3015
3016
3017
3020
3021
3022
3023
External Start
* Remove Jumper-pin between CN26-9 and -7, CN26-10 and -8
when a external power supply is used.
2
1
4
3
6
5
8
7
10
9
12
11
14
13
16
15
18
17
20
19
22
21
24
23
26
25
28
30
27
29
32
34
31
33
36
35
38
37
40
39
-
IN
IN
IN
IN
IN
IN
IN
IN
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
Call Master Job
Alarm/Error Reset
Select Remote Mode
Select Play Mode
Select Teach Mode
IN192
Interference1 Entrance
Prohibited
Work Prohibited
Work Response
0
24
VU
0
24
VU
Running
Servo is ON
Top of Master Job
Alarm/Error Occurred
Battery Alarm
Remote Mode Selected
Play Mode Selected
Teach Mode Selected
In Cube 1
In Cube 2
Operation Origin Point
Intermediate Start OK
(continuousing Sequence)
0
24
VU
0
24
VU
0
24
VU
0
24
VU
+24VU
+24VU
+24VU
+24VU
FG
Logical
Number
Connector
Number
+24VU
0
24
VU
IN
IN
IN
IN
Interference2 Entrance
Prohibited
Internal
Power Supply
+24 V
0
24
V
(24V,1A)
Summary of Contents for Motoman UP6
Page 4: ...UP6 Manipulator Manual ii MOTOMAN NOTES...
Page 65: ...11 1 S Axis Parts List 11 1 11 Parts List 11 1 S Axis Parts List...
Page 67: ...11 2 L U Axis Driving Unit 11 3 11 2 L U Axis Driving Unit...
Page 69: ...11 3 R Axis Driving Unit 11 5 11 3 R Axis Driving Unit...
Page 71: ...11 4 Wrist Unit 11 7 11 4 Wrist Unit...
Page 73: ......
Page 82: ...viii...
Page 94: ...1 4 Equipment Configuration 1 12...
Page 108: ...3 8 Open Phase Check 3 8...
Page 131: ...20...
Page 146: ...xiv...
Page 147: ...Setup Diagnosis...
Page 148: ......
Page 150: ...1 2...
Page 158: ...2 1 Protection Through Security Mode Settings 2 8...
Page 256: ...3 17 File Initialize 3 98...
Page 278: ...4 2 Addition of Base and Station Axis 4 22...
Page 296: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Page 297: ...Hardware...
Page 298: ......
Page 308: ...6 4 Equipment Configuration 6 10...
Page 359: ...Maintenance...
Page 360: ......
Page 368: ...8 8 Open Phase Check 8 8...
Page 388: ...9 4 Recommended Spare Parts 9 20...
Page 389: ...Alarm Error...
Page 390: ......
Page 462: ...11 1 Error Message List 11 18...
Page 463: ......
Page 466: ......
Page 530: ......
Page 531: ......
Page 533: ......
Page 534: ......
Page 535: ......
Page 536: ......
Page 537: ......
Page 538: ......
Page 539: ......
Page 540: ......
Page 541: ......
Page 542: ......
Page 543: ......
Page 544: ......
Page 545: ......
Page 546: ......
Page 547: ......
Page 548: ......
Page 549: ......
Page 550: ......
Page 551: ......
Page 552: ......
Page 553: ......
Page 554: ......
Page 555: ......
Page 556: ......
Page 557: ......
Page 558: ......
Page 559: ......
Page 560: ......
Page 561: ......