MM147 - D4 Hot Melt Unit
Section 5 - Setup
63
Shift Times/Setback Times
Programming Shifts
Three shifts can be programmed into the unit. Start shift, end shift, and setback times can be pre-programmed for
each shift to reduce downtime. Make certain all desired temperatures are set first (see Programming Temperatures,
this section).
First program the time the heaters will be on, off, and in setback for each of the three shifts. Use the Right/Left Arrow
Buttons to move through the times and shifts and the OK Button to get a thumbwheel to set the times and turn on the
setback feature with a “switch” on the thumbwheel. (The heaters can be set with or without using the setback times.)
Set the start, stop, and setback times for all shifts. Leave the unused shifts/times blank (— —).
This screen states that for Shift A, heaters will turn on at 7:00 AM to the setpoint temperatures (set on the
Temperature Screens, previously shown) and off at 3:00 PM, with all heaters going to the setback temperatures from
11:30 AM to 12:00 PM.
This screen states that for Shift C, nothing will be on, since there is no Shift C working.
After setting all shift times, program the shifts that will be enabled for each day of the week. The Up/Down Arrow
Buttons cycle through the different combinations of shifts, and the Left/Right Arrow Buttons cycle through the days of
the week.
From this screen, use the Up/Down Buttons
and the Right/Left Buttons to go through
and adjust the shifts and setback times as
desired. See the next page for an in-depth
review.
Summary of Contents for D4
Page 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Page 4: ......
Page 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Page 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Page 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Page 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Page 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Page 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Page 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Page 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Page 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Page 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Page 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Page 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Page 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Page 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Page 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Page 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Page 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Page 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Page 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Page 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Page 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Page 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Page 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Page 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...