9
Valco Melton
IS0231
Vacuum Feeder Assembly Instructions
Installation - Continued
c.
If the adhesive is at the appropriate level and the
light is red carefully turn the screw clockwise until the
light changes to intermittent red-yellow.
d.
After 3 seconds it should change to green.
e.
If the adhesive is at the appropriate level and the
light is green, turn the screw, carefully, counter
clockwise until the light changes to intermittent red-
yellow.
f.
After 3 seconds it should change back to green.
51. Remove half of the adhesive and close the lid. Be sure that the
light on the amplifier box turns red.
52. Allow the unit to refill. Make sure the light is green and the
adhesive is at the appropriate level.
a.
If the adhesive is not at the appropriate level, repeat
step 50.
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CAUTION!
Check the adhesive level periodically to confirm the
sensor is working properly.
53. Reinsert the protective screw into the amplifier box.
54. Close the front operator panel.
To adjust the sensor delay time:
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CAUTION!
The adhesive pile will be uneven; measure from the top
of the pile to the top of the tank.
48. If the unit does not fill to the appropriate level, check to ensure the
top of the level probe is 0.25" above the clamp. If the unit does fill
to the appropriate level, proceed to step 49.
49. Remove the protective screw on the amplifier box.
50. Adjust the sensor calibration, using a small, flat-head screwdriver
to adjust the calibration screw on the amplifier box.
a.
Turn the screw counter clockwise to raise the
adhesive level.
b.
Turn the screw clockwise to lower the adhesive level.
Summary of Contents for D4
Page 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Page 4: ......
Page 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Page 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Page 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Page 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Page 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Page 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Page 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Page 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Page 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Page 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Page 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Page 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Page 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Page 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Page 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Page 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Page 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Page 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Page 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Page 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Page 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Page 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Page 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Page 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...