MM147 - D4 Hot Melt Unit
Section 4 - Installation
23
Section 4 - Installation
Choosing a Location
The D4 hot melt unit is assembled at the factory. However, the power and the glue hoses must be connected by the
customer. This section contains instructions for making the necessary connections.
While choosing a location for the unit, keep in mind that:
•
Service personnel will need access to the left and right sides of the unit for electrical service, and the
back of the unit for changing the glue hoses and filter.
•
The operator needs easy access to the front operator panel.
•
If the unit will not be moved from one location to another, it should be screwed or bolted to a suitable
stable, flat, level surface.
•
The unit should have clearance around the outside of the case to allow air to circulate freely around it.
•
The unit should have clearance above the top of the unit so it may be filled easily without obstruction
to the operator.
•
The location should be near the glue station so that the glue hoses can be routed to the applicators in
as straight a line as possible.
•
The location for the unit should be clean. Dirt in the glue tank causes clogging of the applicator
nozzles.
•
The unit should be protected from high and low ambient temperatures, as well as from rapid changes
in ambient temperature.
•
The unit must be protected from condensate and water.
•
The unit must be protected from strong vibrations.
•
The tank lid must be able to open fully back so there is no danger of it falling onto operator’s hands
while filling.
Summary of Contents for D4
Page 1: ...D4 Hot Melt Unit Manual Number MM147 Revision Date 6 2018 ...
Page 4: ......
Page 10: ...Table of Contents MM147 D4 Hot Melt Unit 10 Module Status LED 170 Link Activity LED 170 ...
Page 20: ...Section 2 Safety and Use MM147 D4 Hot Melt Unit 20 ...
Page 22: ...Section 3 Basic Features MM147 D4 Hot Melt Unit 22 ...
Page 35: ...MM147 D4 Hot Melt Unit Section 5 Setup 35 Section 5 Setup Control Panel ...
Page 42: ...Section 5 Setup MM147 D4 Hot Melt Unit 42 Set Language Continued Next Page ...
Page 43: ...MM147 D4 Hot Melt Unit Section 5 Setup 43 Set Language Continued ...
Page 44: ...Section 5 Setup MM147 D4 Hot Melt Unit 44 Set Temperature Units ...
Page 47: ...MM147 D4 Hot Melt Unit Section 5 Setup 47 Hose Valve Temperature Continued ...
Page 54: ...Section 5 Setup MM147 D4 Hot Melt Unit 54 Beacon Alarm Setup Continued ...
Page 55: ...MM147 D4 Hot Melt Unit Section 5 Setup 55 Beacon 2 ...
Page 70: ...Section 5 Setup MM147 D4 Hot Melt Unit 70 Sequential Start Valve ...
Page 100: ...Section 6 Operation MM147 D4 Hot Melt Unit 100 ...
Page 106: ...Section 7 Maintenance MM147 D4 Hot Melt Unit 106 ...
Page 110: ...Section 9 Specifications MM147 D4 Hot Melt Unit 110 Dimensions ...
Page 112: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 112 D4 Unit ...
Page 113: ...MM147 D4 Hot Melt Unit Section 10 Part Number List 113 D4 Unit Continued ...
Page 120: ...Section 10 Part Number List MM147 D4 Hot Melt Unit 120 D4 Base Unit 776xx392 ...
Page 142: ...Section 11 Warranty MM147 D4 Hot Melt Unit 142 ...
Page 144: ...Section 12 Service MM147 D4 Hot Melt Unit 144 ...
Page 146: ...Appendix A Password Levels MM147 D4 Hot Melt Unit 146 Setting Level 0 as Default Continued ...
Page 148: ...Appendix B Power Requirements MM147 D4 Hot Melt Unit 148 ...
Page 150: ...Appendix C Instruction Sheets for Option Kits MM147 D4 Hot Melt Unit 150 ...
Page 208: ...5 Valco Melton IS0343 Anybus Installation Installation Continued ...
Page 245: ...Appendix E Communication Protocols Modus MM147 D4 Hot Melt Unit 162 ...