5.5.6 Operation
When the preparations for operation are completed, make a test run.
Supply cooling water and put the pump into operation. The oil in the viewing window will bubble
immediately after the start of pump operation, but the bubbles will soon disappear.
During operation, check the following.
(1)
Recheck the rotational direction of the pump.
(2)
Make sure that the cooling water is flowing.
(3)
Make sure that the oil level is between the two level lines.
Follow the procedure in the “4.1”, “4.2”.
5.5.7 Pumping start operation
Refer to the “Fig. 8”.
(1)
Close the main valve above the inlet side of the mechanical booster pump and start the
pump for separate evacuation to evacuate the lubricating chamber of the mechanical
booster pump.
Then start the backing pump to evacuate the mechanical booster pump and piping.
(2)
Open the main valve above the inlet side of the mechanical booster pump to evacuate
the vacuum chamber.
(3)
When the vacuum chamber is evacuated to a pressure lower than the maximum intake
pressure (Refer to the
“
Table. 3
Performance specifications”), start the mechanical
booster pump.
Follow the procedure in the “4.1”, “4.2”.
5.5.8 Shutdown operation
Refer to the “Fig. 8”.
(1)
Close the main valve between the vacuum chamber and the inlet side of the mechanical
booster pump.
(2)
Stop the mechanical booster pump.
(3)
Stop the backing pump.
(4)
Stop the pump for separate evacuation.
(5)
Open the leak valve 1 to vent the mechanical booster pump and the backing pump to
the atmospheric pressure.
(6)
Open the leak valve 2 to vent the lubricating chamber to the atmospheric pressure.
(7)
Stop the cooling water supply.
Follow the procedure in the “4.1”, “4.2”.
Summary of Contents for PRC-003A
Page 10: ...YO99 0874 DI 002 18 ix Fig 1 Warning Label PRC 003A PRC 006A PRC 012A PRC 018A...
Page 24: ...YO99 0874 DI 002 18 8 2 4 Dimensional drawing Fig 3 PRC 003A Dimensional drawing...
Page 25: ...YO99 0874 DI 002 18 9 Fig 4 PRC 006A Dimensional drawing...
Page 26: ...YO99 0874 DI 002 18 10 Fig 5 PRC 012A Dimensional drawing...
Page 27: ...YO99 0874 DI 002 18 11 Fig 6 PRC 018A Dimensional drawing...
Page 57: ...YO99 0874 DI 002 18 41 Fig 15 PRC 006A Optional attachment figure...
Page 58: ...YO99 0874 DI 002 18 42 Fig 16 PRC 012A Optional attachment figure...
Page 59: ...YO99 0874 DI 002 18 43 Fig 17 PRC 018A Optional attachment figure...
Page 76: ......