6.1 Maintenance
Conduct the maintenance regularly in appropriate check interval. Maintenance period shall differ
depending on the operation purpose. Set the interval once a day at first. Once a week from next week if
you had no problem, then conduct once a month for example. We recommend you, however, to conduct
visual checks and check on the utility every day to see the system condition.
(1) You should check following points at least once per three days while you continue operation.
(2) Whether the Vacuum oil pump oil volume is between two level lines or not.
(3) Check the machine much more frequently during high overload operation (continuous operation
1kPa or more, repeated exhaust atmospheric pressure – vacuum).
(4) Whether the Vacuum pump oil is discolored or not.
(5) Whether the Coolant flows by specified volume.
(6) Whether there is no foreign noise.
(7) Whether there is anything strange in the Motor current value.
(8) Whether there is no water leak.
Summary of Contents for PRC-003A
Page 10: ...YO99 0874 DI 002 18 ix Fig 1 Warning Label PRC 003A PRC 006A PRC 012A PRC 018A...
Page 24: ...YO99 0874 DI 002 18 8 2 4 Dimensional drawing Fig 3 PRC 003A Dimensional drawing...
Page 25: ...YO99 0874 DI 002 18 9 Fig 4 PRC 006A Dimensional drawing...
Page 26: ...YO99 0874 DI 002 18 10 Fig 5 PRC 012A Dimensional drawing...
Page 27: ...YO99 0874 DI 002 18 11 Fig 6 PRC 018A Dimensional drawing...
Page 57: ...YO99 0874 DI 002 18 41 Fig 15 PRC 006A Optional attachment figure...
Page 58: ...YO99 0874 DI 002 18 42 Fig 16 PRC 012A Optional attachment figure...
Page 59: ...YO99 0874 DI 002 18 43 Fig 17 PRC 018A Optional attachment figure...
Page 76: ......