![TriContinent C24000 Product Manual Download Page 20](http://html.mh-extra.com/html/tricontinent/c24000/c24000_product-manual_1162143020.webp)
Place or mount pump(s)
Installation instructions
20
Place or mount pump(s)
Before mounting
Termination jumper J9 is located on the bottom of the pump. To avoid
later inconvenience during installation, make sure it is set correctly for
your situation before securing the pump on a surface. Proper termina-
tions are indicated in "Install communication/power cabling" (page 25).
Mounting
The pumps may be secured at the top, bottom, or either side by four
pre-threaded M3 X 0.5mm mounting holes. Refer to Figure 4-3 for
mounting hole locations and dimensions.
The upright position is used for best priming. For air displacement appli-
cations this is not necessary.
Summary of Contents for C24000
Page 8: ...This page intentionally blank ...
Page 14: ...This page intentionally blank ...
Page 142: ...This page intentionally blank ...