![TriContinent C24000 Product Manual Download Page 132](http://html.mh-extra.com/html/tricontinent/c24000/c24000_product-manual_1162143132.webp)
Precision and accuracy
Reference information
132
•
Priming and preloading
to remove air and charge fluid paths is critical to
fluid handling system performance. See "Optimizing pump performance"
(page 133) for more detail.
•
Probes
for aspirating and dispensing are often the most critical compo-
nent in a fluid handling system. Good probe design should follow the
same general guidelines as tubing and orifices (see above). Additional
probe-specific criteria include:
–
Contour: make all transitions in I.D. smooth and step-free.
–
Surface area: the end of the probe should have as little surface area
as possible. Keep probe end perpendicular to probe and wall thick-
ness minimized to help prevent drops from clinging.
–
Finish: both inside and outside surfaces should be free from burrs.
Summary of Contents for C24000
Page 8: ...This page intentionally blank ...
Page 14: ...This page intentionally blank ...
Page 142: ...This page intentionally blank ...