Chapter 8 Network variable bindings
126
BAS-APG001-EN
UUKL binding list (smoke alarm status)
Table 32 shows an example list of smoke alarm custom bindings. In order
to comply with UL-864 annunciation and control requirements, smoke
alarm signals are sent to the mechanical system, FSCP lamps, and audio
alarms (Sonalerts). Smoke alarms specific to a zone are broadcast to
annunciate smoke alarms regardless of control sequence. A general
smoke alarm is broadcast to signal a switch from HVAC control mode to a
smoke control mode. Floor alarms are sent as an analog value to comply
with the subsequent alarms requirement.
Table 32. Smoke alarm custom bindings
Function
Originator
Network variable
Destination
Smoke alarm any
MP580-2
nvoSwitch02
Mechanical system /nviSwitch37
nvoSwitch02
MP580-3/nviSwitch37
nvoSwitch02
MP580-4/nviSwitch37
smokeAlarmFloor01
MP580-2
nvoSwitch05
Mechanical system /nviSwitch20
nvoSwitch05
MP580-3/nviSwitch09
smokeAlarmFloor02
MP580-2
nvoSwitch06
Mechanical system/nviSwitch21
nvoSwitch06
MP580-3/nviSwitch12
smokeAlarmFloor03
MP580-2
nvoSwitch07
Mechanical system/nviSwitch22
nvoSwitch07
MP580-4/nviSwitch08
smokeAlarmFloor04
MP580-2
nvoSwitch08
Mechanical system/nviSwitch23
nvoSwitch08
MP580-4/nviSwitch11
supplyDuctSmokeDetect
MP580-2
nvoSwitch09
Mechanical system/nviSwitch30
nvoSwitch09
MP580-3/nviSwitch06
returnDuctSmokeDetect
MP580-2
nvoSwitch10
Mechanical system/nviSwitch31
nvoSwitch10
MP580-4/nviSwitch05
stairDuctSmokeDetect
MP580-2
nvoSwitch11
Mechanical system/nviSwitch32
nvoSwitch11
MP580-4/nviSwitch01
stairShaftSmokeDetect
MP580-2
nvoSwitch12
Mechanical system/nviSwitch33
smokeFloorAlarm
MP580-2
nvoPercent20
Mechanical system/nviPercent20
nvoPercent20
MP580-3/nviPercent20
nvoPercent20
MP580-4/nviPercent20
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......