Chapter 5 Installing the Tracer MP581 programmable controller
70
BAS-APG001-EN
Figure 36. Wiring binary outputs
Checking binary inputs
To check binary inputs for proper operation:
1.
Make sure that the sensor is connected and closed.
2.
Set the multi-meter to measure Vac, then measure the voltage across
the input connections at the signal and common screw terminals.
The measured voltage should be less than 0.1 Vac. If the voltage is
greater than this, the input readings may change erratically.
3.
Set the multi-meter to measure Vdc, then measure the voltage across
the input at the signal and common screw terminals.
The measured voltage should be less than 0.1 Vdc. If the voltage is
greater than this, the input readings may be offset.
CAUTION
Equipment damage!
Continue to step 4 only if you completed steps 2 and 3 successfully.
Measuring resistance may damage the meter if the voltage is too high.
4.
Set the multi-meter to measure resistance. If you completed steps 2
and 3 successfully, measure the resistance across the input.
The resistance should be less than 200
Ω
when the binary input is
closed and greater than 1 k
Ω
when it is open.
Powered output
< 1000 ft
(300 m)
< 1000 ft
(300 m)
Pilot relay
24 Vac coil
Signal
Common
Signal
Common
Tape back shield
NOTE: To reduce the potential for transients, locate output
devices in the same room with the Tracer MP581.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......