Chapter 5 Installing the Tracer MP581 programmable controller
60
BAS-APG001-EN
Wiring high-voltage power
WARNING
Hazardous voltage!
Before making electrical connections, lock open the supply-power dis-
connect switch. Failure to do so could result in death or serious injury.
CAUTION
Use copper conductors only!
Unit terminals are designed to accept copper conductors only. Other
conductors may cause equipment damage.
To connect high-voltage power wires:
1.
Lock open the supply-power disconnect switch.
2.
At the top right corner of the enclosure, remove the knockout and
install 0.5-inch (13 mm) conduit (see Figure 29).
Figure 29. Knockout for high-voltage power wires
3.
Open or remove the Tracer MP581 door if it is already installed.
4.
Inside of the enclosure at the top-right corner, remove the high-volt-
age area cover plate.
5.
Feed the high-voltage power wires into the enclosure.
6.
Connect the line wire to the L terminal as shown in Figure 30 on page
61.
7.
Connect the neutral wire to the N terminal.
8.
Connect the green ground wire to the chassis ground screw. The
ground wire must be continuous back to the circuit-breaker panel.
9.
Replace the cover plate.
Power wire entry through
knockout for 0.5-inch conduit
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......