BAS-APG001-EN
99
Chapter 7
Programming
Programming occurs after hardware installation is complete. The smoke
control system must be programmed for automatic response, weekly self-
testing, end-process verification, and response to manual FSCS
commands.
Response times
Time response requirements must be kept in mind when programming.
They are give in Table 27.
The 10 second time limit mentioned in Table 27 controls how fast Tracer
Graphical Programming (TGP) programs can be run. Suggested program
rates are 2 seconds for communication watchdogs and 4–5 seconds for
control programs.
Table 27. Time response requirements
Response time
Process
10 seconds
(UL 864: 49.2.a)
The maximum time allowed from when an acti-
vation signal is received until a fire or smoke
safety function is initiated. An activation signal
could be from the FACP of the FSCS.
15 seconds
The maximum time allowed between a feed-
back signal activation and an FSCS panel indi-
cation (either audio or LED). A feedback signal
will typically be a binary value, either hard-
wired or communicated.
60 seconds
(UL 864: 49.2.c)
Fan operation proof of desired state, either on
or off.
75 seconds
(UL 864: 49.2.c)
Damper position proof of desired position,
either open or closed.
200 seconds
(UL 864: 49.2.b)
The maximum time allowed between determi-
nation of a failure state of critical equipment or
process and notification of that failure. A failure
state could include communication failures or
equipment problems such as a fan not starting
as commanded.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......