Wiring high-voltage ac power
BAS-APG001-EN
43
2.
Set the enclosure back aside and drill holes for the screws at the
marked locations.
Drill holes for #10 (5 mm) screws or #10 wall anchors. Use wall
anchors if the mounting surface is dry wall or masonry.
3.
Insert wall anchors if needed.
4.
Secure the enclosure back to the mounting surface with the supplied
#10 (5 mm) screws.
Wiring high-voltage ac power
Verifying model number for local power requirements
Table 12 lists the available BMTX BCU model. You can find the model
number on the shipping label or on the product label inside the enclosure.
To ensure proper operation of the BMTX BCU, install the power supply
circuit in accordance with the following guidelines:
•
The BCU must receive power from a dedicated power circuit. Failure
to comply may cause control malfunctions.
•
A disconnect switch for the dedicated power circuit must be near the
controller, within easy reach of the operator, and marked as the dis-
connecting device for the controller.
•
High-voltage power-wire conduits or wire bundles must not contain
input/output wires. Failure to comply may cause the controller to mal-
function due to electrical noise.
•
High-voltage power wiring must comply with the National Electrical
Code (NEC) and applicable local electrical codes.
•
High-voltage wiring requires three-wire 120/230 Vac service (line,
neutral, ground).
To connect high-voltage power wires:
WARNING
Hazardous voltage!
Before making electrical connections, lock open the supply-power dis-
connect switch. Failure to do so may cause death or serious injury.
Table 12. BMTX BCU model number
Model
Description
BMTX001DAB000
BMTX BCU, 120 Vac, UUKL listed
Note:
The transformer voltage utilization range is 120 Vac. The panel
automatically detects whether the current is 50 or 60 cycle.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......