Chapter 8 Network variable bindings
128
BAS-APG001-EN
UUKL binding list (actuator Open/Close or
On/Off status)
Table 34 shows an example list of actuator status custom bindings.
Actuator Open/Close or On/Off status is sent from the mechanical system
directly to the FSCP.
Table 34. Actuator status custom bindings
Function
Originator
Network variable
Destination
supplyFanStatus
Mechanical system
nvoSwitch01
MP580-3/nviSwitch04
returnFanStatus
Mechanical system
nvoSwitch02
MP580-4/nviSwitch03
stairFanStatus
Mechanical system
nvoPercent01
MP580-2/nviPercent02
oaDamperStatus
Mechanical system
nvoPercent04
MP580-3/nviPercent01
raDamperStatus
Mechanical system
nvoPercent05
MP580-2/nviPercent01
eaDamperStatus
Mechanical system
nvoPercent06
MP580-4/nviPercent01
supplyDamperFloor01
Mechanical system
nvoPercent07
MP580-3/nviPercent02
returnDamperFloor01
Mechanical system
nvoPercent08
MP580-3/nviPercent03
supplyDamperFloor02
Mechanical system
nvoPercent09
MP580-3/nviPercent04
returnDamperFloor02
Mechanical system
nvoPercent10
MP580-3/nviPercent05
supplyDamperFloor03
Mechanical system
nvoPercent11
MP580-4/nviPercent02
returnDamperFloor03
Mechanical system
nvoPercent12
MP580-4/nviPercent03
supplyDamperFloor04
Mechanical system
nvoPercent13
MP580-4/nviPercent04
returnDamperFloor04
Mechanical system
nvoPercent14
MP580-4/nviPercent05
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......