Chapter 1 Smoke control overview
14
BAS-APG001-EN
Beam smoke detectors minimize interference problems created by
stratified hot air under atrium ceilings. On hot days or days with a high
solar load on the atrium roof, a hot layer of air may form under the
ceiling. The layer can exceed 120
°
F (50
°
C). The smoke from an atrium
fire may not be hot enough to penetrate the layer and reach ceiling-
mounted smoke detectors (Figure 9).
Beam-detector installation typically conforms to one of two
configurations: vertical grid or horizontal grid.
Figure 9: Sample stratification
Vertical grid
The vertical grid is the most common beam detector configuration. A
number of beam detectors, located at different levels under the ceiling,
detect the formation and thickening of a smoke layer. The bottom of the
grid is at the lowest expected smoke stratification level.
Horizontal grid
The horizontal grid is an alternate beam detector configuration A number
of beam detectors, located at different levels under the ceiling, detect the
rising smoke plume. Beam detectors are located:
•
Below the lowest expected smoke stratification level
•
Close enough to each other to ensure intersection with the plume
Note:
Atrium smoke control should not activate on signals from
sprinkler water flow switches or heat detectors. Since the
temperature of a smoke plume decreases with height,
activation by these devices may not provide reliable results.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......