Wiring inputs and outputs
BAS-APG001-EN
65
Wire routing
Figure 32 shows how to route input/output wires through the enclosure.
It also shows the locations of wire-tie brackets. See Figure 27 on page 57
for knockout locations and dimensions. Metal conduit may be required by
local codes when running input/output wires.
Figure 32. Wire routing
Providing low-voltage power for inputs and outputs
The Tracer MP581 controller can provide low-voltage power to inputs and
outputs. Figure 33 on page 66 shows the location of the low-voltage screw
terminals on the termination board. The following limitations apply:
•
Four 24 Vdc screw terminals supply a total of up to 250 mA of power.
•
Two 24 Vac screw terminals supply a total of up to 17 VA of power.
The 50 VA of available power supplies both the 24 Vac screw
terminals and binary outputs.
Note that more than one input or output can receive power from a given
screw terminal. The only limitation is the total amount of power supplied.
Brackets for wire
ties (9 locations)
Recommended
communication wire route
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......