Chapter 5 Installing the Tracer MP581 programmable controller
80
BAS-APG001-EN
Binary output LEDs
The BO1–BO6 LEDs indicate the status of the six binary outputs.
Table 18 describes binary output LED activity.
Service LED
The red Service LED indicates whether the controller is operating nor-
mally. Table 19 describes Service LED activity.
Note:
Each binary output LED reflects the status of the output relay on the
circuit board. It may or may not reflect the status of the equipment
the binary output is controlling. Field wiring determines whether the
state of the binary output LED also applies to the status of the end
device. Table 18 describes the LED states.
Table 18. Binary output LEDs
LED activity
Explanation
LED is on continuously
The relay output is energized.
LED is off continuously
The relay output is de-energized or there is no
power to the board.
Table 19. Red Service LED
LED activity
Explanation
LED is off continuously
when power is applied to
the controller
The controller is operating normally.
LED is on continuously
when power is applied to
the controller
The controller is not working properly, or
someone is pressing the Service Pin button.
LED flashes once every
second
The controller is not executing the application
software because the network connections
and addressing have been removed.
1
1
Restore the controller to normal operation using the Rover service tool. Refer to
EMTX-SVX01D-EN for more information.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......