System termination diagrams
BAS-APG001-EN
35
The wiring between a Tracer MP581 and the FSCS is non-supervised and
power limited. Additional requirements are:
•
Tracer MP581 and FSCS must be in the same room.
•
Wiring between the Tracer MP581 and FSCS must be in conduit.
•
Wiring distance cannot exceed 20 ft.
•
Wire must be #18 AWG.
The number of wires needed between the Tracer MP581(s) and the FSCS
is determined by the total number of zones and manual override switches
at the FSCS. Multiple Tracer MP581 panels may be required to monitor
and control the FSCS. One Tracer MP581 controls the trouble LED and
the Sonalert audible alarm of the FSCS, as well as supplying 24 Vac
power to operate the lamp test relay(s).
Table 9 shows wires for a typical Tracer MP581 that controls the FSCS
trouble LED and the Sonalert audible alarm.
Figure 14 on page 36 shows Tracer MP581 to FSCS wiring.
Table 9. Wires for a Tracer MP581 that control FSCS trouble LED and
Sonalert alarm
Cables per
Tracer
MP581
Type of
wiring
Function
1–22
24 Vac
Binary output to light LED on FSCS
1
24 Vac
Binary output controlling trouble LED
1
24 Vac
Binary output controlling Sonalert alarm LED
1
24 Vac
Binary output controlling Sonalert alarm
1
24 Vac
“Hot” power wire for the FSCS lamp test relays
1
24 Vac
Common
1–36
22 Vdc
Two binary input wires per FSCS switch (up to
36 switches per Tracer MP581)
1
22 Vdc
Binary input wire for lamp test signal
1
22 Vdc
Common
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......