End process verification
BAS-APG001-EN
109
End process verification
End process verification confirms that a device responded to an operation
command. End process verification programming consists of:
•
Programming the system to test binary input points for responses to
commands sent to output points
•
Setting a counter to provide a time delay that allows the system time
to respond before setting a fail flag
•
Setting a fail flag if the counter times out
•
Programming the system to send a fail flag to Tracer MP581s
controlling the FSCS, which results in the FSCS turning on a fail
light
Figure 59 shows an example of TGP used to determine a status of the
outdoor air, return air, and exhaust air dampers. Each damper position
status is compared to the relevant damper position request and a normal/
fail state flag is derived. This segment will trigger an alarm event and
send a fail flag to the Tracer MP581 that interfaces with the FSCS panel.
A mechanical system reaction to the failure is not necessary.
Based on Table 28 on page 101, the self-test needs to be overridden if
either a smoke alarm is triggered or a manual override takes place.
Figure 59. Sample TGP showing fail test technique
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......