Installing the Tracer Summit
BMTX BCU
Mounting the hardware
Make sure that the selected location meets the operating environment
requirements described in this section and clearance requirements
described in this Figure 16 on page 40. The BCU must be installed
indoors. Trane recommends locating it:
•
Near the controlled equipment to reduce wiring costs
•
Where service personnel have easy access
•
Where it is easy to see and to interact with the operator display
•
Where public access is restricted to minimize the possibility of
tampering or vandalism
CAUTION
Avoid equipment damage!
Install the BCU in a location that is out of direct sunlight. Failure to do
so may cause it to overheat.
Operating environment requirements
Make sure that the operating environment conforms to the specifications
listed in Table 11. Enclosure dimensions are illustrated in Figure 17 on
page 41.
Table 11. Operating environment specifications
Temperature
From 32°F to 120°F (0°C to 49°C)
Humidity
10–90% non-condensing
Power requirements
North America: 120 Vac
1 A maximum, 1 phase, 50 or 60 Hz
Weight
Mounting surface must be able to support 60 lb (28 kg)
Dimensions
16 ½ in. × 14 ¾ in. × 5 ½ in.
(418 mm × 373 mm × 140 mm)
Altitude
6500 ft (2000 m)
Installation
Category 3
Pollution
Degree 2
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......