Chapter 5 Installing the Tracer MP581 programmable controller
68
BAS-APG001-EN
Wiring analog outputs
The Tracer MP581 controller has six analog outputs. These outputs can
be either 0–10 Vdc outputs or 0–20 mA outputs. Analog outputs control
actuators and secondary controllers.
To wire an analog output:
1.
For three-wire applications, use a 3-conductor cable with a shield. For
two-wire applications, use a 2-conductor cable with a shield. Connect
the shield to a common terminal at the termination board and tape it
back at the output device (see Figure 35). Do not use the shield wire
as the common connection.
2.
Connect the signal wire to an available analog output terminal
(AO1–AO6).
3.
Connect the supply wire to a 24 Vac terminal as required.
4.
Use the Rover service tool to configure the analog output.
Figure 35. Wiring analog outputs
0–10 Vdc output
Load > 500
Ω
< 300 ft
(100 m)
< 1000 ft
(300 m)
0–20 mA output
Load < 500
Ω
Ac powered actuator
Signal
Common
24 Vac
Signal
Common
< 1000 ft
(300 m)
Signal
Common
Tape back shield
NOTE: To reduce the potential for transients, locate output
devices in the same room with the Tracer MP581.
Summary of Contents for Engineered Smoke Control System
Page 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Page 2: ......
Page 6: ......
Page 12: ...Contents vi BAS APG001 EN ...
Page 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Page 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Page 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Page 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Page 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Page 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Page 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Page 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Page 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Page 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Page 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Page 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Page 154: ...Appendix A References 142 BAS APG001 EN ...
Page 155: ......