1-85
2-c. Add couplant and set transducers to mounting fixture
Add silicone grease as acoustic couplant onto surface of transducers.
Then set them into mounting fixture.
1. Add couplant onto surface 2. Set transducer to fixture. 3. Fix transducers by screw.
of transducer as photo.
Fig. 1.2.9-12 Set the transducers into mounting fixture
2-d. Set cables with the transducers and the main unit
Connect cables with the transducers and the main unit.
1. Connect with the transducers. 2. Connect with the main unit.
Fig. 1.2.9-13 Connect with the transducer cables
2
3
Upstream
(Green)
Downstream
(Red)
2
Insert connector
to be straight.
1
Flow
1
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...