1-115
4C-i. Set cables with transducers and main unit
Connect transducer cable to receptacle of transducers.
Please be noted that cable connector must be insert receptacle straight, not to be obliquely.
Upstream side of cable must be connected to
“UP” side, downstream side to “DN” side.
Fig. 1.2.9-69 Set the transducer cables
Fig. 1.2.9-70 Connect the transducer cables
4C-j. Let’s start measurement
Finished prepare to measurement. Push
O K
key as Fig.1.2.9-68 to start measurement
(mounting information menu).
UP1(Green)
(Upstream)
DN1(Red)
(Downstream)
2
・
Please pay attention to burr of chains, corner of mounting fixtures etc, not to be injured.
・
Please be noted that it may contain popssibility to drop mouting fixture off.
Caution
Required F-Dist
Flow
1. Connection to transducer side
2. Connection to main unit side
1
Insert connector
to be straight.
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...