![Tokyo Keiki UFP-20 Installation & Operation Manual Download Page 125](http://html1.mh-extra.com/html/tokyo-keiki/ufp-20/ufp-20_installation-and-operation-manual_1125190125.webp)
1-114
Fig. 1.2.9-66 Set the mounting fixture with the magnets
4C-g. Add silicone grease onto surface of transducers and set into mounting fixture.
Add silicone grease enough to avoid any air layer between pipe and transducer.
And set transducers into holder, then tighten by screws.
Fig. 1.2.9-67 Set the transducer
4C-h. Check installation condition
Position the transducer-mounting holders on the pipe and align in accordance with the lines
marked on the pipe. Check the F-Dist and acoustic direction as final.
Fig. 1.2.9-68 Message of mounting information
1
Transducer distance must be
measured between red-lines.
2
2
1. Attach fixture by magnet.
2. Check red line on the fixture of the side whether
positions properly.
2. Attach transducer with fixture by screw
to be fit onto pipe.
M e s s a g e
M o u n t i n g I n f o r m a t i o n
CH1
Distance XXX.X mm
Sound-path Z-path method
Transducer UP04AST
1. Add couplant onto transducer surface.
1
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...