![Tokyo Keiki UFP-20 Installation & Operation Manual Download Page 25](http://html1.mh-extra.com/html/tokyo-keiki/ufp-20/ufp-20_installation-and-operation-manual_1125190025.webp)
1-14
1.2.3 Procedure for start up
(1) Remove the protection cover
Prior to set battery, first protection cover must be taken out. Please follow bellow steps.
1. Open hook and loop fastener.
2. Pull hand strap out from sleeve.
3. Pull the protection cover off form down
side.
4. Pick up the main unit.
5. Take out the main unit from the
protection cover.
Fig. 1.2.3-1 Remove the protection cover
2
Sleeve
3
4
5
1
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...