1-17
(4) Battery Charge
Open side cover, then connect AC adaptor.
Please be noted that battery charging will not start during the main unit runs.
Fig. 1.2.3-4 Battery charge
You can check GREEN LED when DC power supplied, also RED LED when charging started.
Charging will be completed when RED LED turns off.
Please be noted following points
・
Main unit can not be charged during power on. Please turn off the power for battery charging.
・
Proper battery icon with remain level will be indicated on the display after a few minutes.
・
In case of NOT used more than 1 month, battery must be disconnected from main unit and keep
cool location.
・
To comply with CE certification, do not operate the unit with the charger plugged in.
RED LED on
・
The battery is designed and specified for main unit. Do not use any other battery except
the specified one by manufacturer. It may result in injury to the operator or damage to the
equipment.
・
Please charge the battery under proper ambient temperature. (0 ~ 40 degree C)
Caution
Open cover
AC adaptor
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...