![Tokyo Keiki UFP-20 Installation & Operation Manual Download Page 121](http://html1.mh-extra.com/html/tokyo-keiki/ufp-20/ufp-20_installation-and-operation-manual_1125190121.webp)
1-110
(4C) Z-path method (Direct transmission method)
Fig. 1.2.9-57 Flow of large transducer with gauge paper
4C-a.
Wrap gauge paper
4C-b.
Mark slit
4C-d.
Rewrap
4C-e.
Extending line
4C-f.
Set mounting fixture by magnet type fixture
with distance
“F-Dist”
4C-g.
Add silicone grease onto surface of transducers
and set into mounting fixture
4C-h.
Check installation condition
4C-i.
Set cables with transducers and main unit
4C-j.
Let
’s start measurement
4C-c.
Mark
½
line
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...