![Tokyo Keiki UFP-20 Installation & Operation Manual Download Page 114](http://html1.mh-extra.com/html/tokyo-keiki/ufp-20/ufp-20_installation-and-operation-manual_1125190114.webp)
1-103
(4B) V-path method (Reflection method) with Gauge Paper
In case of larger pipe, most of the case, over DN2000mm, you may be better to use gauge
paper or similar gauge to set proper F-Dist position.
Fig. 1.2.9-42 Flow of large transducer with gauge paper
4B-a.
Wrap gauge paper
4B-b.
Mark slit
4B-d.
Rewrap
4B-e.
Extending line
4B-f.
Set mounting fixture by magnet type fixture
with distance
“F-Dist”
4B-g.
Add silicone grease onto surface of transducers
and set into mounting fixture
4B-h.
Check installation condition
4B-i.
Set cables with transducers and main unit
4B-j.
Let
’s start measurement
4B-c.
Mark
½
line
Summary of Contents for UFP-20
Page 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Page 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Page 8: ...1 Installation ...
Page 9: ......
Page 17: ......
Page 18: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 130: ...2 Operation ...
Page 131: ......
Page 182: ...3 Other ...
Page 183: ......
Page 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...