Section 8 Maintenance
8-13
3. Connect the 1/8" PTFE tubing into the push-to-connect
fitting labeled as 'Neb Gas'.
4. Finger-tighten the 10-32 PEEK fitting.
5. Connect the high voltage connector.
8.6.3 APCI Probe Removal
Refer to Figure 8-8 for procedure illustration.
1. Disconnect the high voltage connector by pulling straight
up (do not twist).
2. Unscrew the 10-32 PEEK fitting from the probe inlet.
3. Disconnect the 1/8" PTFE tubing from the push-to-connect
fitting labeled as 'Neb Gas'.
4. Disconnect the 1/8" PTFE tubing from the push-to-connect
fitting labeled as 'APCI heated gas'.
5. Loosen the thumbscrew on the front of the ion source
housing.
6. Carefully lift and pull out the APCI probe from the source
chamber.
7. If changing to ESI, remove the corona discharge pin (see
removing the ionization source chamber section).
Figure 8-8 Removing the APCI probe
1
2
3
5
4
6
7
Summary of Contents for CombiFlash EZ Prep
Page 2: ...CombiFlash Rf User Manual ii ...
Page 8: ...CombiFlash Rf User Manual viii ...
Page 52: ...CombiFlash Rf User Manual 2 16 Figure 2 7 Loading test tubes ...
Page 85: ...CombiFlash Rf User Manual 3 20 ...
Page 103: ...CombiFlash Rf User Manual 4 18 ...
Page 185: ...CombiFlash Rf User Manual 6 64 ...
Page 199: ...CombiFlash Rf User Manual 7 14 ...
Page 223: ...CombiFlash Rf User Manual 8 24 ...
Page 225: ......
Page 227: ......
Page 229: ......
Page 231: ......
Page 233: ......
Page 235: ......
Page 237: ......