Section 4 Preparation: Optional 4x Module
4-9
Figure 4-7 Recommended Rf 4x module channel 1 waste connections
60-0923-017 Ferrule
60-0923-015
Compression Fitting
Nut
60-5234-188
Waste Line Assembly
60-5235-053 38 mm Waste Cap, or
60-5235-054 45 mm Waste Cap
To Rf 4x module
Column Waste connections
1, 2, 3, or 4
To Rf 4x Module
Waste Level Sense
connections 1, 2, 3, or 4
Channel 1 Only:
To Rf system
Inject Valve Waste
See step 8 for details on
this connection for
channels 2 through 4.
Tubing Stop
(ferrule)
Ventilation Hole
(Luer fitting)
If necessary, connect
user-supplied tubing and
route to fume hood.
(See Top View)
(Top View)
Column Waste
Waste Level Sense with tubing stop
Inject Valve Waste (Rf
+
)
or Valve Waste Out (Rf 4x)
Ventilation
Summary of Contents for CombiFlash EZ Prep
Page 2: ...CombiFlash Rf User Manual ii ...
Page 8: ...CombiFlash Rf User Manual viii ...
Page 52: ...CombiFlash Rf User Manual 2 16 Figure 2 7 Loading test tubes ...
Page 85: ...CombiFlash Rf User Manual 3 20 ...
Page 103: ...CombiFlash Rf User Manual 4 18 ...
Page 185: ...CombiFlash Rf User Manual 6 64 ...
Page 199: ...CombiFlash Rf User Manual 7 14 ...
Page 223: ...CombiFlash Rf User Manual 8 24 ...
Page 225: ......
Page 227: ......
Page 229: ......
Page 231: ......
Page 233: ......
Page 235: ......
Page 237: ......