Section 4 Preparation: Optional 4x Module
4-11
Figure 4-8 Channel 1 waste tubing connections
Figure 4-9 Channels 2 through 4 waste tubing connections
8. The post-run valve cleaning fluids share a common port for
channels 2 through 4. Select the 48 inch (120 cm) length of
black tubing from the accessory package and connect it to
the Valve Waste Out bulkhead fitting on the Rf 4x module.
Route the other end of this tubing to one of the waste
bottles. (The channel 2 waste bottle is shown in
Figure 4-10.) You can alternatively route it to a container
other than those used for channels 2 through 4, however
the system will not be able to detect the level and prevent
overfilling.
To Waste Bottle 1
(All other connections not shown)
To
Waste
Bottle 3
To
Waste
Bottle 4
(All other connections
not shown)
To
Waste
Bottle 2
Summary of Contents for CombiFlash EZ Prep
Page 2: ...CombiFlash Rf User Manual ii ...
Page 8: ...CombiFlash Rf User Manual viii ...
Page 52: ...CombiFlash Rf User Manual 2 16 Figure 2 7 Loading test tubes ...
Page 85: ...CombiFlash Rf User Manual 3 20 ...
Page 103: ...CombiFlash Rf User Manual 4 18 ...
Page 185: ...CombiFlash Rf User Manual 6 64 ...
Page 199: ...CombiFlash Rf User Manual 7 14 ...
Page 223: ...CombiFlash Rf User Manual 8 24 ...
Page 225: ......
Page 227: ......
Page 229: ......
Page 231: ......
Page 233: ......
Page 235: ......
Page 237: ......