Checking the tractor’s required characteristics
The requirements for the tractor concern:
• The total authorised weight.
• The permitted weight per axle.
• The authorised support weight on the tractor’s linkage.
• The permissible load capacity for the tyres fitted to the tractor.
All of this information can be found on the data plate or on the registration papers and in the tractor manual.
The weight on the tractor’s front axle should be at least 20% of the unladen weight of the tractor.
The tractor must supply the deceleration power (braking) required by the manufacturer when the machine is coupled up to it.
The gross weight of the tractor indicated on the vehicle’s registration papers must be greater than the sum of:
- the unladen weight of the tractor
- the ballast
- the total weight of the towed machine
u
w
kg
Unladen weight of tractor
Cf the tractor’s registration documents
or its instruction manual
F
al
kg
Front axle load when the tractor is empty
r
al
kg
Weight on the rear axle when the tractor is empty
F
rb
kg
Front ballast (if present)
Cf ballast characteristics
l
t
kg
Load transfer of the towed machine
Cf technical specifications
a
m
Distance between the centre of gravity
of the front implement or ballast
and the centre of the front axle (total of a1 + a2)
Cf characteristics
of the different elements or measure
a
1
m
Distance between the centre of the front axle
and the centre point of the front lower linkage arms
a
2
m
Distance between the centre point
of the front lower linkage arms and the centre of gravity
of the front implement or ballast
b
m
Wheelbase of tractor
Cf the tractor’s registration documents
or its instruction manual
C
m
Distance between the centre of the rear axle
and the centre point of the front lower linkage arms
37
FR
2
Mise en route / Start-up / Inbetriebsetzung
Summary of Contents for MAXIDRILL 20 Series
Page 2: ......
Page 14: ...A 14 Livraison Delivery Lieferung ...
Page 16: ...A 16 Livraison Delivery Lieferung ...
Page 18: ...B 18 Livraison Delivery Lieferung ...
Page 20: ...D 20 Livraison Delivery Lieferung ...
Page 22: ...A 22 Mise en route Start up ...
Page 24: ...24 Mise en route Start up ...
Page 26: ...26 Mise en route Start up ...
Page 28: ...1 B 28 Mise en route Start up Inbetriebsetzung ...
Page 30: ...3 2 1 C 30 Mise en route Start up Inbetriebsetzung ...
Page 32: ...a b c D 32 Mise en route Start up Inbetriebsetzung ...
Page 36: ...a b c D 36 Mise en route Start up Inbetriebsetzung ...
Page 40: ...a b c D 40 Mise en route Start up Inbetriebsetzung ...
Page 44: ...1 2 3 4 4 E 44 Mise en route Start up Inbetriebsetzung ...
Page 120: ...1 2 3 4 A 120 Entretien Maintenance Wartung ...
Page 122: ...1 2 2 A 122 Entretien Maintenance Wartung ...
Page 124: ...B 124 Entretien Maintenance Wartung ...
Page 126: ...C 126 Entretien Maintenance Wartung ...
Page 128: ...D 128 Entretien Maintenance Wartung ...
Page 130: ...9 8 5 3 2 6 1 4 7 D 130 Entretien Maintenance Wartung ...
Page 132: ...2 3 11 2 3 4 F 132 Entretien Maintenance Wartung ...
Page 134: ...5 F 134 Entretien Maintenance Wartung ...
Page 136: ...1 2 F 136 Entretien Maintenance Wartung ...
Page 138: ...F 138 Entretien Maintenance Wartung ...
Page 140: ...Maxi Drill H 140 Entretien Maintenance Wartung ...
Page 142: ...I 142 Entretien Maintenance Wartung ...
Page 144: ...1 K 144 Entretien Maintenance Wartung ...
Page 146: ...1 2 L 146 Entretien Maintenance Wartung ...
Page 148: ...1 2 N 148 Entretien Maintenance Wartung ...
Page 150: ...A 150 Caractéristiques Characteristics Technische Daten ...