
Periodic changeover set to "Auto" means that weekly periodic changeover of the
lead aggregate can be activated.
Periodic changeover
Periodic changeover balances out the number of operating hours between the
individual aggregates.
Main menu > Commissioning > Settings > ....
or
Main menu > Settings > Aggregates > Rotary step switch > Rotary step switch 1…2 >
Operating line
Range
Factory setting
Changeover day
--- / Monday…Sunday
---
Changeover time
00:00…23:59
04:00
You can set the changeover time (weekday, time) to avoid changeover to another
lead aggregate at undesirable times (e.g. weekend).
Periodic changeover set to "Auto" means that changeover by operating hours can
be activated. In this case, changeover of the lead aggregate occurs in dependence
of the lead aggregate's operating hours.
Changeover by operating
hours
Changeover by operating hours balances out the number of operating hours
between the individual aggregates.
Main menu > Commissioning > Settings > ....
or
Main menu > Settings > Aggregates > Rotary step switch > Rotary step switch 1…2 >
Operating line
Range
Factory setting
Changeover
interval
----, 1…1440 h
---
There is no changeover by operating hours if "Changeover interval" is set to "---".
Operating hours changeover can be carried out with
or
without a changeover day
and time. To do this, both changeover day and time must be activated.
After a set time, the next aggregate is selected as lead aggregate upon
changeover time defined in periodic changeover.
Operating hours are counted only if:
Note
Modulating aggregates are connected.
Control of the modulating aggregate > 80 %.
Sequence selector set to "Auto" means that continuous changeover of the lead
aggregate can be activated.
First in first out
The aggregate switched on first is switched off if several aggregates are switched
on and the load drops.
First-in first out balances out the number of operating hours between the individual
aggregates.
Main menu > Commissioning > Settings > ....
or
Main menu > Settings > Aggregates > Rotary step switch > Rotary step switch 1…2 >
Operating line
Range
Factory setting
First in first out
No/Yes
No
With this setting, an additional aggregate can be switched even if the locking time
of the aggregate switched off most recently has not yet expired.
89 / 216
Siemens
Switching and monitoring device RMS705B
CE1P3124en
Building Technologies
Aggregates
01.04.2010