
8.4.16 Wiring test
During the wiring test, the motors can be directly switched via the control switch.
Main menu > Commissioning > Wiring test > Outputs >
Wiring test
Operating line
Comment
Motor 1…
Motor 6
Off, Speed 1, Speed 2
(2-speed motor on display).
[Motor 1] A…
[Motor 6] A
Off, On
(1-speed motor, twin motor on display).
[Motor 1] B…
[Motor 6] B
Off, On
(twin motor on display).
Adjustable times acting directly on the relay are effective (run-up time, coasting
time).
Note
8.4.17 Assign texts
Adapt the texts for the motors via operation. They are displayed at the relevant
operating line and on the menu.
Main menu > Commissioning > Settings > ....
or
Setting values
Main menu > Settings > Aggregates > Motor > Motor 1...6 >
Operating line
Range
Factory setting
Motor 1…
Motor 6
Max. 20 characters
Motor 1…
Motor 6
See Section 16.4 "Editable texts RMS705B" for an overview of all editable texts
and on how to reset them.
8.4.18 Operating hours
The total number of operating hours is acquired for each motor output. The counter
counts to max. 99 999 hours and then rolls over to 0.
Main menu > Aggregates > Motor > Motor 1...6 >
Display values
Operating hours motor A
0...99'999 h
Operating hours motor B
0...99'999 h
You can adapt the counter value at the password level, and e.g. reset it to 0.
Main menu > Settings > Aggregates > Motor > Motor 1...6 >
Setting values
Operating line
Range
Factory setting
Operating hours motor A
0...99'999 h
0
Operating hours motor B
0...99'999 h
0
The operating hours for speeds 1 and 2 are summarized for the 2-speed motor
(sum of 1 and 2).
Note
123 / 216
Siemens
Switching and monitoring device RMS705B
CE1P3124en
Building Technologies
Aggregates
01.04.2010