
3 Commissioning
Only qualified staff trained by Siemens Switzerland Ltd may prepare and
commission Synco™ 700 products.
3.1
Start commissioning
During commissioning, both control and plant safety functions remain deactivated!
3.1.1
Start at initial power-up
RMS705B starts with menu "Language" (to commission or operate the plant) when
the unit is first powered.
–
Select the language by turning the OK knob and confirm your selection.
–
Set and confirm time, date, and year using the OK knob.
The "Commissioning" menu is displayed. The access level is set to "Password
level".
Follow the installation instructions G3151, 74 319 0731 0 (added to device
package) to initially commission the RMS705B.
Note
3.1.2
Start from the main menu
After selecting menu "Commissioning" (only visible on the "Password level") and
confirming by pressing the OK knob, a reference to plant stop is displayed.
Caution!
Plant stops
ESC
OK
Press OK again to stop the plant (application). All outputs are set to a defined OFF
state and the display shows the "Commissioning" menu.
Commissioning
Basic configuration...
Extra configuration...
Settings...
Communication...
Setting level:
Commissioning menu.
18 / 216
Siemens
Switching and monitoring device RMS705B
CE1P3124en
Building Technologies
Commissioning
01.04.2010