3. Setting-up procedure
(1)
Installing desk unit
A
Place the copier on the desk
B
Secure the copier to the desk
C
Connect the desk relay harness
D
Secure the desk on the floor
(2)
Releasing optical system lock
(3)
Setting fusing unit
A
Removing fusing unit
B
Pressurize heat roller
C
Installing cleaning roller
(4)
Cleaning charger roller
A
Cleaning main charger unit
B
Cleaning transfer/separation charger unit wire
(5)
Installing RADF tray
A
Connecting RADF tray connector
B
Installing tray
(6)
Setting developer unit
A
Removing the developing unit
B
Supplying the developer
C
Adjusting toner density sensor level
D
Checking process control sensor value
(7)
Toner supply
(8)
Setting up paper tray 1/2
(9)
Setting up paper tray 3 (LCC tray)
A
Paper size setting
B
Adjust any center misalignment
(10)
Checking copy density
(11)
Installing sorter (SF-S53N) <option>
(12)
Installing sorter (SF-S15) <option>
(1) Installing desk unit
Be sure to unplug the copier before carrying out the
following procedures.
A. Place the copier on the desk.
Place the copier on the desk so that the feet of the copier fit into the
corresponding holes in the desk.
When doing this, be careful that the copier does not come to rest on
the paper guide or other parts of the desk that might be damaged by
the weight of the copier.
B. Secure the copier to the desk.
Use the included four mounting screws to secure the copier to the
desk.
•
In addition to securing the copier to the desk, these screws also
function to electrically ground the desk, so be sure to tighten all
mounting screws securely.
Parts for use with the Deck unit
Included parts
Mounting screws
(4 pcs.)
Parts for use with the SF-S53N
Caster spacers
(4 pcs.)
Caster mounting screws (M4 x 60)
(8 pcs.)
Paper guide
Mounting
screws
Desk
Desk
Mounting
screws
Copier
Right side
Copier
Left side
5 – 4