19
S a f e t y i n s t r u c t i o n s
V115E_09.20
Series-65H Hoist Pos 2
DECAL SCXXYYF
USER INSTRUCTIONS
CONCLUDING THE WORK
ACTION DURING POWER CUT
Ta 15501 2/2
IF THE POWER CUT LAST FOR A LONG TIME, THE HOIST CAN BE LOWERED TO THE
NEXT LANDING LEVEL BY OPENING MOTOR BRAKES MANUALLY. PRESS BOTH
LEVERS SLIGHTLY BACKWARDS, TOWARDS THE MOTOR END. THE BRAKES ARE
LOOSENED AND THE HOIST MOVES SLOWLY DOWNWARDS.
RUN THE HOIST TO THE GROUND STATION.
CLOSE DOOR (BASE FRAME DOOR AND HOIST DOOR)
TURN THE
IN THE BASE FRAME CONTROL BOX TO POSITION
"0". WHEN NECESSARY USE SEPARATE LOCK TO LOCK THIS SWITCH TO PREVENT
ILLICIT USE.
MAIN SWITCH (Q1)
ATTENTION! IN WEATHER CONDITIONS, WHERE THE TEMPERATURE GETS CLOSE
TO ZERO OR UNDER IT AND THE RELATIVE HUMIDITY IN THE AIR IS HIGH, IT CAN
BE NECESSARY TO KEEP THE HEATING ON AND PREVENT WATER FROM CONDENSING
IN THE EL-BOX.
ATTENTION! THE HOIST WILL NOT MOVE IF ANY OF THE LANDING GATES/
DOORS OR CAGE DOORS IS OPEN. THE HOIST WILL NOT MOVE EITHER
IF THE ROOF HATCH IS OPEN OR WHEN THERE IS OVERLOAD IN CAGE.
IF THE POWER SUPPLY IS CUT AND HOIST WILL STOP,
BY GIVING AN
EMERGENCY SIGNAL. PUSH THE PUSH BUTTON
OR USE THE PHONE.
CALL HELP
(S15)" ALARM SIGNAL"
ATTENTION! DO NOT GET OUT WITHOUT SUPERVISION, AND DO NOT CLIMB
ACROSS SCAFFOLDING OR ACROSS THE MAST BECAUSE OF THE DANGER OF
FALLING DOWN!
ATTENTION! DO NOT LOWER THE HOIST TOO FAST, AS THE SAFETY BRAKE
MIGHT THEN ENGAGE AND STOP THE HOIST ENTIRELY.
AFTER REACHING THE NEXT PLATFORM, OPEN THE HOIST DOOR AT THE LANDING
SIDE MANUALLY WITH "TRIANGLE KEY"
SAFETY BRAKE
ONCE THE SAFETY BRAKE HAS ENGAGED, IT IS NO LONGER POSSIBLE TO RUN THE HOIST.
CALL HELP
(S15)
BY GIVING AN EMERGENCY SIGNAL. PUSH THE PUSH BUTTON
THE PERSON RESPONSIBLE FOR MAINTENANCE OF HOIST MUST BE INFORMED.
ATTENTION! WHEN THE SAFETY BRAKE HAS ENGAGED, THE REASON FOR THIS
HAS TO BE CLARIFIED CAREFULLY AND THE POSSIBLE DEFECT HAS TO BE FIXED
BEFORE THE HOIST IS TAKEN INTO USE!
Summary of Contents for 65H Series
Page 2: ...2 T a b l e o f C o n t e n t s Series 65H Hoist Pos 0 V115E_09 20...
Page 10: ...G e n e r a l i n f o r m a t i o n 2 V115E_09 20 Series 65H Hoist Pos 1...
Page 26: ...G e n e r a l i n f o r m a t i o n 18 V115E_09 20 Series 65H Hoist Pos 1 4450 L L1 L2 TWIN...
Page 34: ...G e n e r a l i n f o r m a t i o n 26 V115E_09 20 Series 65H Hoist Pos 1...
Page 36: ...S a f e t y i n s t r u c t i o n s 2 V115E_09 20 Series 65H Hoist Pos 2...
Page 46: ...S a f e t y i n s t r u c t i o n s 12 V115E_09 20 Series 65H Hoist Pos 2 MAX 1000 kg TH_10E...
Page 54: ...S a f e t y i n s t r u c t i o n s 20 V115E_09 20 Series 65H Hoist Pos 2 Tx527...
Page 55: ...21 S a f e t y i n s t r u c t i o n s V115E_09 20 Series 65H Hoist Pos 2...
Page 82: ...O p e r a t i n g i n s t r u c t i o n s 24 V115E_09 20 Series 65H Hoist Pos 3...
Page 84: ...2 V115E_09 20 T r o u b l e s h o o t i n g Series 65H Hoist Pos 4...
Page 124: ...10 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Page 144: ...30 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Picture 3c Picture 3b...
Page 154: ...40 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Page 156: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...
Page 164: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...