37
V115E_09.20
Service and maintenance
Series-65H Hoist Pos 5
After such adjustment should be carried
out to check horizontal gap between sill of
the cage and sill of the ground station. In
the case of uneven gap using bogie rollers
1,3 and 2,4 set the gap even (always try to
split this regulations evenly for left and right
bogie rollers otherwise side roller horizontal
movement can be reduced to 0, which is
not acceptable).
In case of excessive tilt sill of the cage rel-
ative to the ground station sill adjust the
position of bogie rollers 1,2 and 3,4 to set
the sill of the cage parallel to the sill of the
ground station (always try to split this reg-
ulations evenly for upper and lower bogie
rollers otherwise side roller horizontal move-
ment can be reduced to 0, which is not ac-
ceptable)
The final task in the cage adjustment is to
set correct mesh between the safety brake
pinion tooth and rack
0.45 - 0.50 mm
: at
first release the 4 fixing screw of the safe
-
ty brake plate in the cage (Pic.16), then re-
lease fixing screw of the counter roller, then
move the pinion towards the rack using
special screws M16, placed on the safety
brake plate (inside the cage) (Pic.17), as
long as the proper mesh of pinion tooth will
be achieved (Pic.18)
Then one should push the counter roller,
which are embedded eccentrically in the
safety brake plate, to the rack and lock
them in the correct position (no detectable
backlash) tightening the screws (Pic. 18)
Picture 16
Picture 17
Picture 18
Tightening torque 125 - 135 Nm
for screw M16
use LOCTITE 243
Summary of Contents for 65H Series
Page 2: ...2 T a b l e o f C o n t e n t s Series 65H Hoist Pos 0 V115E_09 20...
Page 10: ...G e n e r a l i n f o r m a t i o n 2 V115E_09 20 Series 65H Hoist Pos 1...
Page 26: ...G e n e r a l i n f o r m a t i o n 18 V115E_09 20 Series 65H Hoist Pos 1 4450 L L1 L2 TWIN...
Page 34: ...G e n e r a l i n f o r m a t i o n 26 V115E_09 20 Series 65H Hoist Pos 1...
Page 36: ...S a f e t y i n s t r u c t i o n s 2 V115E_09 20 Series 65H Hoist Pos 2...
Page 46: ...S a f e t y i n s t r u c t i o n s 12 V115E_09 20 Series 65H Hoist Pos 2 MAX 1000 kg TH_10E...
Page 54: ...S a f e t y i n s t r u c t i o n s 20 V115E_09 20 Series 65H Hoist Pos 2 Tx527...
Page 55: ...21 S a f e t y i n s t r u c t i o n s V115E_09 20 Series 65H Hoist Pos 2...
Page 82: ...O p e r a t i n g i n s t r u c t i o n s 24 V115E_09 20 Series 65H Hoist Pos 3...
Page 84: ...2 V115E_09 20 T r o u b l e s h o o t i n g Series 65H Hoist Pos 4...
Page 124: ...10 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Page 144: ...30 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Picture 3c Picture 3b...
Page 154: ...40 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Page 156: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...
Page 164: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...