
4 - 5
Work Procedure
434
434
(3) land leveling pattern
The land leveling work may be
performed after crushing soil or
not.
The vehicle speed can be set
faster when performing the land
leveling work with soil crushed
already.
When working in a wet field, fill
the field with a sufficient amount
of water so that the trace of
plowing cannot be seen.
The border shown in the fig-
ure should be set a little narrow-
er than two times of one plowing
width.
Refer to the alternating returning
pattern for other details.
•
•
•
•
•
Moving direction
Reverse driving
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
()
(7)
(1)
(8)
(1)
995E003A
⊙
Turning:
RK19-영문-04(라).indd 5
2017-05-18 오후 6:26:06
Summary of Contents for RK19 Hydrostatic
Page 31: ...MEMO RK19 영문 01A 안 indd 30 2017 05 19 오전 9 41 34 ...
Page 35: ...MEMO RK19 영문 01B 가 indd 4 2017 05 18 오후 6 37 58 ...
Page 41: ...1 GENERAL INFORMATION DANGER R19O103A RK19 영문 01B 가 indd 6 2017 05 18 오후 6 38 02 ...
Page 43: ...1 GENERAL INFORMATION GDQJHU T19O107C RK19 영문 01B 가 indd 8 2017 05 18 오후 6 38 05 ...
Page 77: ...MEMO OPERATION RK19 영문 03 다 indd 8 2017 05 19 오전 9 45 17 ...
Page 83: ...MEMO WORK PROCEDURE RK19 영문 04 라 indd 6 2017 05 18 오후 6 26 06 ...
Page 107: ...MEMO MAINTENANCE AND SERVICE RK19 영문 05 마 indd 24 2017 05 18 오후 6 35 34 ...
Page 111: ...MEMO STORAGE AND DISPOSAL RK19 영문 06 바 indd 4 2017 05 19 오전 9 47 29 ...
Page 121: ...MEMO TROUBLESHOOTING RK19 영문 07 사 indd 10 2017 05 19 오전 9 48 59 ...
Page 129: ...MEMO SAFETY STANDARD FOR FARM WORK RK19 영문 08 아 indd 8 2017 03 07 오후 4 24 15 ...
Page 134: ...INDEX 1 INDEX 10 2 10 RK19 영문 10 인덱스 indd 1 2017 05 18 오후 6 50 05 ...
Page 139: ...RK19 영문 10 인덱스 indd 6 2017 05 18 오후 6 50 05 ...