
4 -
Work Procedure
(1) When driving the tractor to at-
tach or detach an implement,
make sure that there is no one
in between or around the tractor
and implement.
() Install and remove the imple-
ment only on safe and level
ground.
(3) When installing a heavy imple-
ment, install weight on the front
to keep balance.
(4) When adjusting an implement,
apply the parking brake, stop the
engine and set the PTO switch
in the OFF position in advance.
(5) To tow anything, use the towing
hitch only.
rotavator
<safety precautions for rotavator>
Never remove the safety cover
of the rotavator.
Do not remove the PTO shaft
cover and safety cover on the
universal joint.
When adjusting each part, disen-
gage the PTO and stop the en-
gine in advance.
When driving on a road, keep
the PTO disengaged. Also, keep
the rotavator lowered on a road
as long as it does not hit the
ground.
For the universal joint, its inner
shaft and outer shaft should be
overlapped at least 5,9 in.(15 cm).
Check that the universal joint is
firmly fixed to the tractor and ro
-
tavator shaft.
►
•
•
•
•
•
•
1. Precautions for handling imPlement
2. general imPlement
Read instructions on warning de-
cals on each implement thorough-
ly before work.
To avoid an injury due to mishan-
dling of an implement, read the
user's manual of the implement
thoroughly and work safely and
precisely with caution.
Installation of an improper imple-
ment can lead to an injury. Install
only implements specified by the
Manufacturer.
•
•
•
WARNING
RK19-영문-04(라).indd 2
2017-05-18 오후 6:26:03
Summary of Contents for RK19 Hydrostatic
Page 31: ...MEMO RK19 영문 01A 안 indd 30 2017 05 19 오전 9 41 34 ...
Page 35: ...MEMO RK19 영문 01B 가 indd 4 2017 05 18 오후 6 37 58 ...
Page 41: ...1 GENERAL INFORMATION DANGER R19O103A RK19 영문 01B 가 indd 6 2017 05 18 오후 6 38 02 ...
Page 43: ...1 GENERAL INFORMATION GDQJHU T19O107C RK19 영문 01B 가 indd 8 2017 05 18 오후 6 38 05 ...
Page 77: ...MEMO OPERATION RK19 영문 03 다 indd 8 2017 05 19 오전 9 45 17 ...
Page 83: ...MEMO WORK PROCEDURE RK19 영문 04 라 indd 6 2017 05 18 오후 6 26 06 ...
Page 107: ...MEMO MAINTENANCE AND SERVICE RK19 영문 05 마 indd 24 2017 05 18 오후 6 35 34 ...
Page 111: ...MEMO STORAGE AND DISPOSAL RK19 영문 06 바 indd 4 2017 05 19 오전 9 47 29 ...
Page 121: ...MEMO TROUBLESHOOTING RK19 영문 07 사 indd 10 2017 05 19 오전 9 48 59 ...
Page 129: ...MEMO SAFETY STANDARD FOR FARM WORK RK19 영문 08 아 indd 8 2017 03 07 오후 4 24 15 ...
Page 134: ...INDEX 1 INDEX 10 2 10 RK19 영문 10 인덱스 indd 1 2017 05 18 오후 6 50 05 ...
Page 139: ...RK19 영문 10 인덱스 indd 6 2017 05 18 오후 6 50 05 ...