
11
-
WARRANTY
11
Warranty Coverage:
This warranty is transferable to each subsequent purchaser for the duration of the warranty period. Repair or
replacement of any warranted part will be performed at an authorized ENGINE or distributor.
Warranted parts not scheduled for replacement as required maintenance in the owner's manual shall be
warranted for the warranty period. Warranted parts scheduled for replacement as required maintenance in the
owner's manual are warranted for the period of time prior to the first scheduled replacement. Any warranted
parts scheduled for replacement as required maintenance that are repaired or replaced under warranty shall be
warranted for the remaining period of time prior to the first scheduled replacement. Any part not scheduled for
replacement that is repaired or replaced under warranty shall be warranted for the remaining warranty period.
During the warranty period, ENGINE is liable for damages to other engine components caused by the failure of
any warranted part during the warranty period.
Any replacement part which is functionally identical to the original equipment part in all respects may be used in
the maintenance or repair of your engine, and shall not reduce ENGINE's warranty obligations.
Add-on or modified parts that are not exempted may not be used. The use of any non-exempted add-on or
modified parts shall be grounds for disallowing a warranty.
Warranted Parts:
This warranty covers engine components that are a part of the emission control system of the engine as
delivered by ENGINE to the original retail purchaser. Such components may include the following:
(A) Fuel injection system
(B) Electronic control system
(C) Cold start enrichment system
RK19-영문-11-보증서.indd 7
2017-05-18 오후 6:46:05
Summary of Contents for RK19 Hydrostatic
Page 31: ...MEMO RK19 영문 01A 안 indd 30 2017 05 19 오전 9 41 34 ...
Page 35: ...MEMO RK19 영문 01B 가 indd 4 2017 05 18 오후 6 37 58 ...
Page 41: ...1 GENERAL INFORMATION DANGER R19O103A RK19 영문 01B 가 indd 6 2017 05 18 오후 6 38 02 ...
Page 43: ...1 GENERAL INFORMATION GDQJHU T19O107C RK19 영문 01B 가 indd 8 2017 05 18 오후 6 38 05 ...
Page 77: ...MEMO OPERATION RK19 영문 03 다 indd 8 2017 05 19 오전 9 45 17 ...
Page 83: ...MEMO WORK PROCEDURE RK19 영문 04 라 indd 6 2017 05 18 오후 6 26 06 ...
Page 107: ...MEMO MAINTENANCE AND SERVICE RK19 영문 05 마 indd 24 2017 05 18 오후 6 35 34 ...
Page 111: ...MEMO STORAGE AND DISPOSAL RK19 영문 06 바 indd 4 2017 05 19 오전 9 47 29 ...
Page 121: ...MEMO TROUBLESHOOTING RK19 영문 07 사 indd 10 2017 05 19 오전 9 48 59 ...
Page 129: ...MEMO SAFETY STANDARD FOR FARM WORK RK19 영문 08 아 indd 8 2017 03 07 오후 4 24 15 ...
Page 134: ...INDEX 1 INDEX 10 2 10 RK19 영문 10 인덱스 indd 1 2017 05 18 오후 6 50 05 ...
Page 139: ...RK19 영문 10 인덱스 indd 6 2017 05 18 오후 6 50 05 ...