
8 - 6
Safety Standard for farm work
5. InStructIon after uSe
When the work is completed, stop the engine on a
leveled ground, check the machine to clean. (remove
any foreign materials)
- Remove straws, dirt, etc and clean around the en-
gine, silencer, and fuel tank.
Lay a cover on the transplanter (equipment) after the
muffler and engine cool down.
Get a regular inspection after the season is over.
- When discarding a part (battery, oil, etc) or scrap a
machine, consult to a RK Tractors and proceed ac-
cordingly.
For long-term storage, remove the battery from the
machine and store it or disconnect the negative battery
cable.
6. cautIonS for InSpectIon and maIntenance
Do not refuel either when the engine is still hot or
while driving.
Measures against a fire: Every working place with a
risk of fire should be provided with a fire extinguisher.
Prevent a fire by taking measures such as making a
smoking area.
Always wipe off the leaked fuel.
Be seated in the cab when starting the engine.
After refueling, tighten the fuel cap and check if there
is any fuel leakage from tank or pipe.
When opening a cap to supply water to radiator, be
careful because steam or boiling water may spray due
to overheating.
When getting off the cab, turn off the engine, lock the
parking brake and remove the ignition key.
If it is inevitable to park on a slope, choke the wheels.
Park on a leveled and safe ground safely.
Check if the wiring code is in contact with other parts,
peeled, loose or having spacing.
RK19-영문-08(아).indd 6
2017-03-07 오후 4:24:15
Summary of Contents for RK19 Hydrostatic
Page 31: ...MEMO RK19 영문 01A 안 indd 30 2017 05 19 오전 9 41 34 ...
Page 35: ...MEMO RK19 영문 01B 가 indd 4 2017 05 18 오후 6 37 58 ...
Page 41: ...1 GENERAL INFORMATION DANGER R19O103A RK19 영문 01B 가 indd 6 2017 05 18 오후 6 38 02 ...
Page 43: ...1 GENERAL INFORMATION GDQJHU T19O107C RK19 영문 01B 가 indd 8 2017 05 18 오후 6 38 05 ...
Page 77: ...MEMO OPERATION RK19 영문 03 다 indd 8 2017 05 19 오전 9 45 17 ...
Page 83: ...MEMO WORK PROCEDURE RK19 영문 04 라 indd 6 2017 05 18 오후 6 26 06 ...
Page 107: ...MEMO MAINTENANCE AND SERVICE RK19 영문 05 마 indd 24 2017 05 18 오후 6 35 34 ...
Page 111: ...MEMO STORAGE AND DISPOSAL RK19 영문 06 바 indd 4 2017 05 19 오전 9 47 29 ...
Page 121: ...MEMO TROUBLESHOOTING RK19 영문 07 사 indd 10 2017 05 19 오전 9 48 59 ...
Page 129: ...MEMO SAFETY STANDARD FOR FARM WORK RK19 영문 08 아 indd 8 2017 03 07 오후 4 24 15 ...
Page 134: ...INDEX 1 INDEX 10 2 10 RK19 영문 10 인덱스 indd 1 2017 05 18 오후 6 50 05 ...
Page 139: ...RK19 영문 10 인덱스 indd 6 2017 05 18 오후 6 50 05 ...